10 Marla House Construction in 2023
In 2023, the construction of 10 Marla houses has seen a significant surge in costs, primarily driven by substantial hikes in material prices. While pre-constructed 10 Marla homes are available for sale across Pakistan at varying rates, opting to construct your own dwelling offers not only potential cost savings but also the creative freedom to design a space that perfectly aligns with your unique needs. A 10 Marla house project encompasses both the essential grey structure and the intricate finishing touches, making it a comprehensive endeavor that requires meticulous planning and budgeting. This guide unveils the intricacies of 10 Marla house construction costs, spanning from the foundational steps to the final finishes.
Understanding the 10 Marla House
10 Marla House Covered Area
A standard 10 Marla house typically boasts a double-story configuration, encompassing a covered area of approximately 3300 square feet. The ground floor accounts for 1650 square feet, while the first floor comprises 1550 square feet. A typical 10 Marla house floor plan includes provisions for five bedrooms, each with attached bathrooms, two kitchens, a TV lounge, a drawing room, a laundry space, a terrace, and a mumtee.
Step-by-Step Guide to 10 Marla House Construction
Embarking on a 10 Marla house construction journey involves a meticulously orchestrated sequence of steps, each demanding attention to detail and careful planning.
10 Marla House Construction Material
To lay the foundation for your 10 Marla abode, you must procure an array of essential construction materials, including:
- Bricks: The backbone of your home’s structure, bricks are a time-tested building material known for their durability and energy efficiency. For a double-story 10 Marla house, you’ll require an estimated 97,000 bricks to cover both the foundation and the entire grey structure.
- Cement: Serving as the binding agent in construction, cement finds utility in various phases, including wall plastering, masonry work, roofing, and more. Selecting a high-quality cement type is crucial to ensure strength and longevity. For a 10 Marla house, you’ll need around 1020 cement bags.
- Sand: Essential for foundation construction, mortar, and concrete plaster, sand comes in two primary types: Chenab sand and River sand. A 10 Marla project demands 7000 CFT of Ravi sand and 1200 CFT of Chenab sand.
- Crush: Crush, or bajri, plays a pivotal role in various construction phases. Margala crush and Sargodha crush are the preferred choices in Pakistan. Plan for 2100 CBF of Margala crush and 1600 CBF of Sargodha crush for your 10 Marla house.
- Ghassu: This mixture of clay and sand, typically sourced from riverbeds, strengthens the foundations of your home.
- Steel: Steel bars are vital for lintels, slabs, water tanks, columns, and beams. Opt for 60-grade steel bars to ensure maximum strength. You’ll need 5 tons (5000 kg) of steel for your 10 Marla construction.
- Door and Window Frames (Choughat): Installing frames for doors and windows is a critical step during the grey structure phase.
- Safety Grills: Essential for windows and the main gate, safety grills add security and aesthetic appeal to your home.
- Main Gate: The design, gauge, and size of your main gate influence its cost.
- Plumbing and Sanitary: This phase involves installing pipelines for water, sewerage, and gas, along with bathroom and kitchen fixtures.
- Electric Wiring: Electrical work encompasses conduits, pipes, junction boxes, switches, and other components.
- Brick Ballast (Rori): Required for PCC and flooring, rori must be properly laid and compacted.
- Termite Proofing: Protect your foundation by investing in termite proofing before construction.
- Water Storage Tank: Constructing a water tank on the rooftop ensures a consistent water supply.
- Polythene Sheets for Waterproofing: Waterproofing is crucial for maintaining the integrity of your home’s structure.
- Labor Cost: The labor cost can vary depending on your location and current rates.
Total Grey Structure Cost for 10 Marla House
After considering the quantities and rates of these materials, the estimated cost for the grey structure of a 10 Marla house in 2023 is approximately 15,050,000 PKR.
10 Marla House Finishing Steps
- Flooring Tiles
- Stair Marble and Kitchen Shelves
- Paint and Ceiling
- Windows and Railing
- Woodwork
- Bath Accessories
- Kitchen Accessories
- Electric Equipment
- Geyser and Manhole
The finishing phase of a 10 Marla house project ushers in the final touches that transform your dwelling into a complete home. It encompasses elements such as:
- Flooring Tiles: Tiles are a popular choice for flooring due to their durability and aesthetic appeal. You’ll need approximately 280 tiles for various areas of your home.
- Stair Marble and Kitchen Shelves: Granite stair marble and kitchen shelves add a touch of elegance to your home.
- Paint and Ceiling: The right paint and ceiling design can greatly enhance the aesthetics of your living spaces.
- Windows and Railing: Windows, doors, and railings contribute to both the security and visual appeal of your home.
- Woodwork: This includes doors, cabinets, wardrobes, and other wooden elements.
- Bath Accessories: Fixtures, cabinetry, and other accessories are vital for a functional bathroom.
- Kitchen Accessories: Outfitting your kitchen with the necessary appliances and equipment is an essential part of finishing.
- Electric Equipment: Lighting, electrical outlets, and switches are crucial components of the finishing phase.
- Geyser and Manhole: These items ensure a comfortable living environment.
The estimated cost for the finishing phase of a 10 Marla house in Pakistan is approximately 150,00,000 PKR.
Total Approx Cost for 10 Marla House Construction and Finishing
When you combine the cost of the grey structure and finishing, the total cost for a 10 Marla house construction project in 2023 amounts to approximately 25,800,000 PKR. However, it’s important to note that these costs can fluctuate based on market trends, location, material choices, and other factors. By taking on the task of constructing your own home, you not only have the potential to save significantly but also the opportunity to customize your living space to your exact preferences. This investment can yield substantial returns if you choose to sell the property in the future.
Summary
A typical 10 Marla house includes both the essential structural work and finishing touches. This comprehensive guide breaks down the construction costs step by step.
The covered area of a standard 10 Marla house is approximately 3300 square feet, featuring five bedrooms, two kitchens, a TV lounge, a drawing room, a laundry area, a terrace, and a mumtee.
The construction process involves procuring various materials, including bricks, cement, sand, crush, steel, and more. The estimated cost for the grey structure of a 10 Marla house in 2023 is around 15,050,000 PKR.
The finishing phase includes flooring tiles, stair marble, paint, windows, woodwork, bath and kitchen accessories, electric equipment, and more. The estimated cost for finishing is approximately 15,000,000 PKR.
Combining the grey structure and finishing costs, the total estimated cost for constructing a 10 Marla house in 2023 is roughly 25,800,000 PKR. These costs can vary based on location, material choices, and market trends. Constructing your own home offers potential savings and customization opportunities, which can yield significant returns if you decide to sell the property in the future.